Go to Project List

Cross River Rail (TSD)

Cross River Rail - Woolloongabba

Project Outline

Cross River Rail is an underground railway through central Brisbane, which is currently under construction. Cross River Rail is a new 10.2 kilometre rail line from Dutton Park to Bowen Hills, which includes 5.9 kilometres of twin tunnels under the Brisbane River and the CBD. The $5.4 billion Cross River Rail project unlocks this bottleneck by delivering a second river crossing, allowing more trains to run more often and enabling a turn-up-and-go public transport system across the entire region.

Scope of Work

Construction Photography showing the commencement of ground works on the Cross River Rail in Brisbane.

Deliverables

Professional Photographs demonstrating the safe work ethic on the project

Still Photography

Ground works at Wooloongabba for the Cross River Rail (TSD Section), taken by one of our professional photographersMeasuring the pile depth on the Cross River Rail at WoolloongabbaProfessional photography at the Woolloongabba site of the Cross River RailReinforcing cages for the Woolloongabba section of the Cross River Rail, photo captured by a professional construction photographer on the Cross River RailProfessional photography of the piling works on the Cross River Rail.Ground works at Woollloongabba for the Cross River Rail, captured by one of the professional photographers working with Rapax Construction Photography

Videos

Cross River Rail - Woolloongabba

List of Projects

Click the project name below to access more information and view photos and videos from the project.